  • Once the soil is completely dry : • SOnce the soil is completely dry : • Start a fire up in the fireplace. Maintain it sufficiently. • Wait until the oven is really hot, a suitable thermometer can be placed inside to check the temperature. This can take between 30 and 40 minutes. • Place the dish(es) in the oven and keep an eye on the baking process by quickly opening the oven door. Carry on maintaining the fire as normal. The heat provided by the oven can also warm up a room. Translation by Michelle Demaraisa room. Translation by Michelle Demarais  +
  • Place the 10 cm diameter pipe between the hole left in the arch and the roof, so it's tight  +
  • • Build a solid wooden table. Shape it so • Build a solid wooden table. Shape it so the canister can be laid down on the middle of the table and so that 30 cm are left on each side of it. • Make a square-shaped hole in the middle of the table 20 cm*20 cm • Cover it with an even layer of mud 4 cm thicker it with an even layer of mud 4 cm thick  +
  • • Lay the bricks on the surface of the tab• Lay the bricks on the surface of the table without covering the hole. The surface must be the straightest and most horizontal possible. • Lay the canister on the middle of the table, horizontally. It must be slightly raised so the air can circulate underneath. • Build a cement-brick arch in order to cover the canister, leaving a 10 cm space around it. Leave a 10 cm hole on top of the arch for the passage of the flue. • At the end of this stage, only the opening of the canister should be visible.opening of the canister should be visible.  +
  • • Mix the soil (clay soil if possible) wit• Mix the soil (clay soil if possible) with water in a big bucket. • Mix well. • Cover the arch with the fine wire mesh once the correct shape has been given. • Make sure you leave the 10 cm hole in the arch free, for the flue , • Cover the wire mesh with a 4 cm layer of mud without covering up the 10 cm hole. • Leave to dry.ing up the 10 cm hole. • Leave to dry.  +
  • • Shut the barrel so it's airtight. A hinge can be welded on the side of the opening of the barrel. (see photo) • Brackets for the grill can be welded directly inside the canister(see photo)  +
  • • Under the table, build a rectangular fir• Under the table, build a rectangular fireplace with an opening for the fuel to be put in. • At the back of the fireplace, build a vertical chimney with a 20*20 dimension, going from the ground, up to the underside of the table. • Check the sealing of the cement.e. • Check the sealing of the cement.  +