  • Mark either with a pen or with tape inside the drum, the height from the bottom layer of concrete to which the dense concrete needs to be poured (350/300/260)
  • Prepare the mix referring to how to make concretes up and what goes in them in Stage X.
  • Pour the concrete in 5 cm max. passes.
  • Pack the concrete down after each pass in a consistent manner. If the concrete is packed down too much on one side, the cardboard mould will not stay in.
  • Make sure the thicknesses are uniform and symmetrical as to not allow any movement in the moulds.
  • If necessary, re-position the wedges as you are pouring the concrete.
  • Repeat until you have reached the specified height.