Difference between revisions of "Translations:Phytoépuration eaux usées/149/en"

(Page créée avec « * For construction dug into the ground, place a root-resistant barrier. »)
 
 
Line 1: Line 1:
* For construction dug into the ground, place a root-resistant barrier.
+
* For construction dug into the ground, set a root-resistant barrier down.

Latest revision as of 21:49, 2 October 2020

Information about message (contribute)
This message has no documentation. If you know where or how this message is used, you can help other translators by adding documentation to this message.
Message definition (Phytoépuration eaux usées)
* Pour les constructions enterrées, poser une barrière anti-racines
Translation* For construction dug into the ground, set a root-resistant barrier down.
  • For construction dug into the ground, set a root-resistant barrier down.